Nuclear Reactor Maps: Maanshan Nuclear Power Plant


Maanshan 1

Herng Chuen, Taiwan
Pressurized Water Reactor (PWR)
Net Output: 890 MWe
Operable. Initial criticality: 03/1984. Commercial start: 07/1984.

Utility:
     Taiwan Power Co. 
Reactor Supplier:
     Westinghouse Electric Corp. 
Steam Generator Supplier:
     General Electric Co. 
Architecture:
     Bechtel Corp. 
Construction:
     Taiwan Power Co.

Maanshan 2

Herng Chuen, Taiwan
Pressurized Water Reactor (PWR)
Net Output: 890 MWe
Operable. Initial criticality: 02/1985. Commercial start: 05/1985.

Utility:
     Taiwan Power Co. 
Reactor Supplier:
     Westinghouse Electric Corp. 
Steam Generator Supplier:
     General Electric Co. 
Architecture:
     Bechtel Corp. 
Construction:
     Taiwan Power Co.